雅虎数据中心

描述:

设计,安装,and commissioned a 5 MW data center.  The innovative design used a custom air handler design to incorporate air economizer and direct evaporative humidification.  These two features reduce mechanical energy consumption by 45%.  Project included a stratified chilled water storage tank for use as a"热电池”during power outages.  The Building Management System includes complete serial monitoring of all electrical equipment.